To achieve LEED certification, what is the minimum percentage of construction waste that must be diverted from landfills?
Correct Answer
D) 75%
LEED requires a minimum of 75% of construction waste to be diverted from landfills through recycling, reuse, or other waste management strategies to earn points in the Materials and Resources category.
Why This Is the Correct Answer
LEED (Leadership in Energy and Environmental Design) certification requires a minimum of 75% construction waste diversion from landfills to earn points in the Materials and Resources category. This threshold demonstrates significant commitment to sustainable construction practices through recycling, reuse, donation, or other approved waste management strategies. The 75% requirement balances environmental responsibility with practical construction realities, making it achievable while still promoting substantial waste reduction efforts.
Why the Other Options Are Wrong
Option A: 90%
90% waste diversion exceeds LEED requirements and would be extremely difficult to achieve on most construction projects. While some projects may reach this level, it is not the minimum threshold required for LEED certification points.
Option B: 50%
50% waste diversion falls short of LEED's minimum requirement. This percentage would not earn points in the Materials and Resources category, as LEED sets a higher standard to promote more aggressive waste reduction practices.
Option C: 25%
25% waste diversion is insufficient for LEED certification points. This low percentage does not demonstrate the level of environmental commitment that LEED standards require for sustainable construction practices.
Memory Technique
Remember 'Three-quarters for LEED' - 75% waste diversion is three-quarters of all construction waste, making it a substantial majority that must be kept out of landfills.
More Contract Admin Questions
A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?
A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?
What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?
A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?
A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?
An indemnification clause in a construction contract typically requires the contractor to:
A property owner wants to convert a single-family home into a duplex in an area zoned for single-family residential use. The conversion meets all building codes but violates density requirements. What approval is needed?
As-built drawings are typically required to be submitted:
AIA Document A401 is primarily used for:
A general contractor is building a 12,000 square foot commercial warehouse. The building permit fee is calculated at $8.50 per $1,000 of construction value. If the project value is $2,400,000, what is the building permit fee?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
