The Florida Building Code requires that construction documents be prepared by whom for commercial buildings over what square footage?
Correct Answer
C) Licensed architect or engineer for buildings over 5,000 sq ft
The Florida Building Code requires that construction documents for commercial buildings over 5,000 square feet be prepared under the direct supervision of a licensed architect or engineer.
Why This Is the Correct Answer
The Florida Building Code specifically mandates that construction documents for commercial buildings exceeding 5,000 square feet must be prepared under the direct supervision of either a licensed architect OR a licensed engineer. This threshold of 5,000 sq ft is a critical regulatory requirement that ensures proper professional oversight for larger commercial projects. The code allows flexibility by accepting either professional discipline, recognizing that both architects and engineers have the expertise to handle commercial building design.
Why the Other Options Are Wrong
Option A: Licensed architect for buildings over 5,000 sq ft
This option is incorrect because it only mentions licensed architects and excludes licensed engineers, who are also qualified to prepare construction documents for commercial buildings over 5,000 sq ft under Florida Building Code.
Option B: Licensed engineer for buildings over 3,000 sq ft
This option is wrong because it specifies the wrong square footage threshold (3,000 sq ft instead of 5,000 sq ft) and only mentions engineers while excluding architects who are also qualified professionals.
Option D: Licensed architect for buildings over 10,000 sq ft
This option is incorrect because it states the wrong square footage threshold (10,000 sq ft instead of 5,000 sq ft) and only mentions architects while excluding licensed engineers.
Memory Technique
Use '5-A-E': 5,000 square feet requires either an Architect or Engineer - the number 5 looks like an 'S' for 'Square feet' and A-E for the two professional options.
Reference Hint
Florida Building Code, Chapter 1, Section 107 - Submittal Documents, or Florida Statutes Chapter 481 (Architecture) and Chapter 471 (Engineering)
More Project Mgmt Questions
What is the minimum R-value required for wall insulation in Florida Climate Zone 2?
A subcontractor brings a new chemical product to your jobsite. Under the Globally Harmonized System (GHS), what information must be immediately available to workers?
A construction site has a trench that is 8 feet deep in Type B soil. What is the maximum allowable slope ratio for the trench walls without protective systems?
A detail drawing shows a scale of 3/4" = 1'-0". If a dimension measures 2.25 inches on the drawing, what is the actual dimension?
What is the maximum recommended spacing between drywall screws when attaching to wood studs?