Contract AdminProceduresmedium13% of exam part

In a LEED project pursuing Materials and Resources credits, what percentage of construction waste must typically be diverted from landfills?

Correct Answer

A) 75%

LEED Materials and Resources credits typically require diverting 75% or more of construction waste from landfills through recycling, reuse, or other waste management strategies to earn points in this category.

Answer Options
A
75%
B
50%
C
25%
D
90%

Why This Is the Correct Answer

LEED Materials and Resources Credit 2 (Construction and Demolition Waste Management) requires diverting at least 75% of construction and demolition waste from landfills to earn points. This threshold represents the standard benchmark for achieving meaningful waste reduction in sustainable construction projects. The credit encourages recycling, salvaging, and reusing materials to minimize environmental impact and promote circular economy principles in construction operations.

Why the Other Options Are Wrong

Option B: 50%

50% represents a lower threshold that would not meet LEED's stringent sustainability requirements for Materials and Resources credits. While 50% diversion is better than no waste management plan, LEED standards demand higher performance levels to demonstrate significant environmental commitment and earn certification points in the waste management category.

Option C: 25%

25% diversion is insufficient for LEED certification requirements and represents minimal waste management effort. This low percentage would not qualify for any Materials and Resources credits, as LEED expects substantial waste reduction commitments that demonstrate serious environmental stewardship and sustainable construction practices beyond basic compliance.

Option D: 90%

90% diversion, while environmentally excellent, exceeds the minimum requirement for LEED Materials and Resources credits. Though achieving 90% diversion would certainly earn points, the standard threshold is 75%. Setting unrealistic expectations could discourage participation in LEED programs and make certification unnecessarily difficult for many projects.

Memory Technique

Remember '75% for LEED' - think 'Three-quarters of waste must be diverted' or 'LEED loves 75% - Lucky LEED Loves three-quarters!'

Was this explanation helpful?

More Contract Admin Questions

A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?

A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?

What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?

A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?

A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?

An indemnification clause in a construction contract typically requires the contractor to:

A property owner wants to convert a single-family home into a duplex in an area zoned for single-family residential use. The conversion meets all building codes but violates density requirements. What approval is needed?

As-built drawings are typically required to be submitted:

AIA Document A401 is primarily used for:

A general contractor is building a 12,000 square foot commercial warehouse. The building permit fee is calculated at $8.50 per $1,000 of construction value. If the project value is $2,400,000, what is the building permit fee?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.