Correct Answer
C) 1:20 (5%)
Per the Florida Building Code and ADA requirements, ramps with slopes steeper than 1:20 (5%) are considered ramps and require handrails. Slopes of 1:20 or less are considered sloped walkways and do not require handrails.
Why This Is the Correct Answer
Option C (1:20 or 5%) is correct because the Florida Building Code establishes this as the threshold between sloped walkways and ramps. Any slope steeper than 1:20 is classified as a ramp and requires handrails for safety. Slopes at 1:20 or less are considered sloped walkways and can be constructed without handrails, making this the maximum allowable slope for accessible paths without handrail requirements.
Why the Other Options Are Wrong
Option A: 1:12 (8.33%)
Option A (1:12 or 8.33%) is incorrect because this slope is steeper than the 1:20 threshold and would require handrails. While 1:12 is the maximum slope allowed for accessible ramps WITH handrails, it exceeds the limit for ramps without handrails.
Option B: 1:16 (6.25%)
Option B (1:16 or 6.25%) is incorrect because this slope exceeds the 1:20 threshold and would require handrails. Any slope steeper than 1:20 is classified as a ramp requiring safety features including handrails.
Option D: 1:25 (4%)
Option D (1:25 or 4%) is incorrect because while this slope would not require handrails (being less steep than 1:20), it is not the maximum allowable slope. The question asks for the maximum slope without handrails, which is 1:20, not the more conservative 1:25.
Memory Technique
Remember '1:20 is the key' - slopes of 1:20 or less are 'walkways,' anything steeper becomes a 'ramp' requiring handrails. Think 'Twenty is plenty' for no handrails.
Reference Hint
Florida Building Code Chapter 11 - Accessibility, Section 1133 (Accessible Routes) or ADA Standards Section 405 (Ramps)
More Project Mgmt Questions
What is the minimum R-value required for wall insulation in Florida Climate Zone 2?
A subcontractor brings a new chemical product to your jobsite. Under the Globally Harmonized System (GHS), what information must be immediately available to workers?
A construction site has a trench that is 8 feet deep in Type B soil. What is the maximum allowable slope ratio for the trench walls without protective systems?
A detail drawing shows a scale of 3/4" = 1'-0". If a dimension measures 2.25 inches on the drawing, what is the actual dimension?
What is the maximum recommended spacing between drywall screws when attaching to wood studs?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Previous Question
A confined space has an oxygen reading of 18%, hydrogen sulfide at 8 ppm, and carbon monoxide at 30 ppm. What is the entry status?
Next Question
A trench excavation is 12 feet deep in Type C soil. Workers need to enter for utility installation. Calculate the minimum horizontal distance from the edge of the excavation to the top of the sloped sides using the maximum allowable slope.