According to CSI MasterFormat, which division covers concrete work?
Correct Answer
B) Division 03 - Concrete
Division 03 specifically covers all concrete work including cast-in-place concrete, precast concrete, and concrete accessories in the CSI MasterFormat system.
Why This Is the Correct Answer
Division 03 - Concrete is the correct CSI MasterFormat division that covers all concrete work. This includes cast-in-place concrete, precast concrete, concrete accessories, concrete reinforcement, concrete restoration, and specialized concrete applications. The CSI MasterFormat is organized numerically, and Division 03 is specifically designated for all concrete-related construction activities and materials.
Why the Other Options Are Wrong
Option A: Division 02 - Existing Conditions
Division 02 - Existing Conditions covers site assessment, demolition, site preparation, and environmental remediation work. It deals with existing site conditions and preparatory work before new construction begins, not concrete work.
Option C: Division 05 - Metals
Division 05 - Metals covers structural steel, metal fabrications, metal decking, and ornamental metals. This division is for metal construction materials and assemblies, not concrete work.
Option D: Division 04 - Masonry
Division 04 - Masonry covers brick, block, stone, and other masonry units and assemblies. While masonry and concrete are both structural materials, they are separate divisions with concrete having its own dedicated division.
Memory Technique
Remember '03 = Concrete' - both start with 'C' and the number 3 looks like a backwards 'C' for Concrete.
More NASCLA Questions
Which AIA document contains the general conditions that govern the rights and responsibilities of all parties in a construction contract?
A construction company has direct labor costs of $85,000, direct materials of $120,000, and overhead costs of $45,000 for a project. What is the total job cost?
What is the primary purpose of job cost accounting in construction?
A construction company has current assets of $350,000 and current liabilities of $280,000. What is the company's working capital?
In CSI MasterFormat, which division covers earthwork and site preparation?
In a mechanical drawing, what does 'CFM' typically measure?
In CSI MasterFormat Division 08, which of the following would typically be included?
On a mechanical plan, what does the symbol 'RTU' typically indicate?
What is the minimum preheat temperature for welding ASTM A992 steel when the ambient temperature is 15Β°F?
A general contractor's balance sheet shows total assets of $850,000, current liabilities of $320,000, and long-term debt of $180,000. What is the company's equity?