A quality control inspection reveals that 15% of installed windows fail to meet specifications. What should be the immediate priority?
Correct Answer
B) Stop installation and investigate the root cause
With a 15% failure rate, there's likely a systemic problem. Installation should stop immediately to investigate and correct the root cause before continuing.
Why This Is the Correct Answer
With a 15% failure rate, there's likely a systemic problem. Installation should stop immediately to investigate and correct the root cause before continuing.
More NASCLA Questions
Which AIA document contains the general conditions that govern the rights and responsibilities of all parties in a construction contract?
A construction company has direct labor costs of $85,000, direct materials of $120,000, and overhead costs of $45,000 for a project. What is the total job cost?
What is the primary purpose of job cost accounting in construction?
A construction company has current assets of $350,000 and current liabilities of $280,000. What is the company's working capital?
In CSI MasterFormat, which division covers earthwork and site preparation?
In a mechanical drawing, what does 'CFM' typically measure?
In CSI MasterFormat Division 08, which of the following would typically be included?
On a mechanical plan, what does the symbol 'RTU' typically indicate?
What is the minimum preheat temperature for welding ASTM A992 steel when the ambient temperature is 15Β°F?
A general contractor's balance sheet shows total assets of $850,000, current liabilities of $320,000, and long-term debt of $180,000. What is the company's equity?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass
Project Management
60 questions Β· 70% to pass
Related Study Resources
Previous Question
A contractor is deciding between purchasing a $85,000 excavator or renting one for $1,200 per week. The project requires the equipment for 18 weeks. If the purchased equipment depreciates 15% annually and financing costs 6% annually, what is the approximate ownership cost for the project period?
Next Question
A masonry crew of 3 workers can lay 1,200 square feet of block wall per day. If the crew costs $85 per hour total and works 8-hour days, what is the labor cost per square foot for block installation?