A crawler excavator has a maximum reach of 28 feet and is positioned 15 feet from a building. The excavation needs to extend 35 feet from the building. What is the best solution?
Correct Answer
B) Reposition the excavator during the work
The excavator can reach 28 feet from its position, but the work extends 35 feet from the building (15 + 35 = 50 feet total). Repositioning the excavator closer to or within the work area will allow completion of the excavation.
Why This Is the Correct Answer
Repositioning the excavator is the most practical and cost-effective solution. The excavator's 28-foot reach is sufficient to complete the work if positioned strategically. By moving the excavator closer to the building or within the excavation area as work progresses, the contractor can reach all required areas without additional equipment or significant delays. This approach maximizes the use of existing equipment while maintaining project efficiency.
Why the Other Options Are Wrong
Option A: Use a different excavator with longer reach
While using a different excavator with longer reach would work, it's unnecessarily expensive and inefficient when the current equipment can complete the job with simple repositioning. This option increases costs without providing significant benefit.
Option C: Use hand digging for the remaining area
Hand digging 20+ feet of excavation (the area beyond the excavator's reach) would be extremely time-consuming, labor-intensive, and costly. This approach would significantly delay the project and increase labor costs unnecessarily when mechanical solutions are available.
Option D: Modify the excavation plan
Modifying the excavation plan may not be feasible due to structural, utility, or design requirements. The excavation dimensions are typically determined by engineering specifications that cannot be arbitrarily changed to accommodate equipment limitations.
Memory Technique
Remember 'REACH before REPLACE' - always consider repositioning existing equipment before getting new equipment or changing methods.
Reference Hint
Construction Equipment and Methods chapter on earthmoving equipment capabilities and positioning strategies
More Project Mgmt Questions
What is the minimum R-value required for wall insulation in Florida Climate Zone 2?
A subcontractor brings a new chemical product to your jobsite. Under the Globally Harmonized System (GHS), what information must be immediately available to workers?
A construction site has a trench that is 8 feet deep in Type B soil. What is the maximum allowable slope ratio for the trench walls without protective systems?
A detail drawing shows a scale of 3/4" = 1'-0". If a dimension measures 2.25 inches on the drawing, what is the actual dimension?
What is the maximum recommended spacing between drywall screws when attaching to wood studs?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Previous Question
When installing a vapor barrier in a Florida climate, where should it typically be located in the wall assembly?
Next Question
An employee is injured while operating equipment that was not properly locked out. The equipment had multiple energy sources. What is the primary violation under OSHA standards?