Contract AdminContractsmedium40% of exam part

A contractor is working on a time and materials contract with a labor rate of $85/hour plus 15% markup on materials. If 40 hours of labor are used and materials cost $3,200, what is the total billable amount?

Correct Answer

A) $7,280

Labor cost: 40 hours × $85 = $3,400. Material cost with markup: $3,200 × 1.15 = $3,680. Total: $3,400 + $3,680 = $7,080. Wait, let me recalculate: $3,400 + $3,680 = $7,080, but that's option B. Actually $3,200 + 15% = $3,680, so $3,400 + $3,680 = $7,080.

Answer Options
A
$7,280
B
$7,080
C
$6,680
D
$6,880

Why This Is the Correct Answer

There appears to be an error in the provided explanation. The correct answer should be B ($7,080), not C ($7,280). The calculation shows: Labor = 40 hours × $85 = $3,400; Materials with 15% markup = $3,200 × 1.15 = $3,680; Total = $3,400 + $3,680 = $7,080. The explanation confirms this calculation but incorrectly identifies the answer as C when the math clearly points to B.

Why the Other Options Are Wrong

Option B: $7,080

$6,880 is incorrect because it appears to calculate materials without the 15% markup ($3,200 + $3,680 labor calculation error) or uses an incorrect labor rate calculation

Option C: $6,680

CORRECT_ANSWER - This matches the proper calculation of $3,400 labor + $3,680 materials with markup = $7,080

Option D: $6,880

$6,680 is too low and likely results from either forgetting the markup on materials entirely or making calculation errors in both labor and material costs

Memory Technique

Remember 'LM+' - Labor (straight rate) + Materials (with markup) = Total. For percentage markup, always add 1 to the decimal (15% markup = multiply by 1.15, not 0.15)

Reference Hint

Florida Building Code Business and Finance section on contract pricing and markup calculations, or general contracting business practices chapter

Was this explanation helpful?

More Contract Admin Questions

A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?

A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?

What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?

A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?

A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?

An indemnification clause in a construction contract typically requires the contractor to:

A property owner wants to convert a single-family home into a duplex in an area zoned for single-family residential use. The conversion meets all building codes but violates density requirements. What approval is needed?

As-built drawings are typically required to be submitted:

AIA Document A401 is primarily used for:

A general contractor is building a 12,000 square foot commercial warehouse. The building permit fee is calculated at $8.50 per $1,000 of construction value. If the project value is $2,400,000, what is the building permit fee?

People Also Study

Related Study Resources

Practice More Contractor Exam Questions

Access all practice questions with progress tracking and adaptive difficulty to pass your Florida General Contractor exam.

Start Practicing

Disclaimer: EstatePass is an independent exam preparation platform and is not affiliated with, endorsed by, or connected to any state contractor licensing board, the Construction Industry Licensing Board (CILB), the Department of Business and Professional Regulation (DBPR), NASCLA, Pearson VUE, PSI, or any government agency. Exam requirements, fees, and regulations change frequently. Always verify current requirements with your state's licensing board before making decisions. Information shown was last verified on the dates indicated and may not reflect the most recent changes.