A concrete mix design specifies a water-cement ratio of 0.45. If 564 pounds of cement are used per cubic yard, what is the maximum amount of water that should be added?
Correct Answer
B) 254 pounds
Water-cement ratio = weight of water / weight of cement. 564 × 0.45 = 253.8 ≈ 254 pounds
Why This Is the Correct Answer
Water-cement ratio = weight of water / weight of cement. 564 × 0.45 = 253.8 ≈ 254 pounds
More NASCLA Questions
Which AIA document contains the general conditions that govern the rights and responsibilities of all parties in a construction contract?
A construction company has direct labor costs of $85,000, direct materials of $120,000, and overhead costs of $45,000 for a project. What is the total job cost?
What is the primary purpose of job cost accounting in construction?
A construction company has current assets of $350,000 and current liabilities of $280,000. What is the company's working capital?
In CSI MasterFormat, which division covers earthwork and site preparation?
In a mechanical drawing, what does 'CFM' typically measure?
In CSI MasterFormat Division 08, which of the following would typically be included?
On a mechanical plan, what does the symbol 'RTU' typically indicate?
What is the minimum preheat temperature for welding ASTM A992 steel when the ambient temperature is 15°F?
A general contractor's balance sheet shows total assets of $850,000, current liabilities of $320,000, and long-term debt of $180,000. What is the company's equity?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Project Management
60 questions · 70% to pass
Related Study Resources
Previous Question
A roofing project requires 120 squares of shingles. The crew installs 8 squares per day with 3 workers at $35 per hour, working 8 hours daily. Material cost is $185 per square including 8% waste. What is the total estimated cost?
Next Question
Which CSI MasterFormat division would include fire suppression systems?
