A trench is 125 feet long, and access is required within 25 feet under the problem rule. How many access points are needed?
Correct Answer
A) 5 access points.
Using one access point per 25 feet in this layout, 125 / 25 = 5 access points.
Why This Is the Correct Answer
Using one access point per 25 feet in this layout, 125 / 25 = 5 access points.
Why the Other Options Are Wrong
Option B: 4 access points.
4 access points. is below the supported result for excavation access; it likely omits allowance, conversion, coverage, or final round-up.
Option C: 6 access points.
6 access points. is above the supported result for excavation access; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Option D: 25 access points.
25 access points. is above the supported result for excavation access; it likely double-counts allowance, uses the wrong unit, or rounds too early.
Memory Technique
Measure to point, adjust for feet, then let Laying Out set the finish line.
Reference Hint
Study anchor (closed-book): memorize Excavation access from Cal/OSHA Title 8 Construction Safety Orders; CSLB Law and Business. / Title 8 excavation access and egress; know the rule or calculation trigger without relying on exam-room lookup.
More Law & Business Questions
A Fresno homeowner wants a $725 cabinet repair and trim adjustment. Which contract step best matches CA home improvement requirements?
A project has $6,500 retainage withheld. The owner releases 60 percent of retainage at substantial completion. How much cash is released?
Cash is $52,500 and monthly burn is $17,500. How many months of runway are available?
A supplier offers 1.5 percent early-pay discount on a $22,000 invoice. What is the discount?
A balance sheet lists assets of $310,000 and liabilities of $185,000. What is owner's equity?
A job is estimated to cost $135,000. What price gives a 25 percent gross margin?
A customer invoice of $4,000 has a stated late charge of 1.5 percent. What late charge is added?
A bid has direct labor of $18,000, materials of $12,500, and equipment rental of $3,500. If the contractor adds 20 percent markup on direct cost, what is the bid price?
A contractor wants a 25 percent gross margin on a job with estimated cost of $60,000. What selling price gives that margin?
A completed project sold for $150,000 and had total cost of $126,000. What gross margin percentage did the project earn?