When setting up batter boards for a building layout, what is the primary purpose of the horizontal boards?
Correct Answer
C) To hold string lines that define building corners and wall locations
Batter boards hold string lines that define the exact location of building corners and wall lines. This allows for accurate layout and the ability to re-establish layout lines if they are disturbed during construction.
Why This Is the Correct Answer
The horizontal boards on batter boards serve as anchor points for string lines that precisely define the building's layout. These string lines mark the exact location of building corners and wall centerlines, creating an accurate reference grid for construction. The strings can be easily removed during excavation and re-established using the same batter boards, ensuring consistent layout throughout the construction process. This system allows contractors to maintain precise building dimensions and square corners even when the original layout stakes are disturbed.
Why the Other Options Are Wrong
Option A: To mark the exact depth of excavation
While batter boards are used during the layout phase before excavation, they do not directly mark excavation depth. Excavation depth is typically marked using grade stakes, laser levels, or story poles that reference the established grade elevations.
Option B: To provide reference points for foundation wall height
Foundation wall height is established through separate elevation references and benchmarks, not through the horizontal boards of batter boards. The batter board system is primarily concerned with horizontal positioning and layout, not vertical elevation control.
Option D: To establish the building's elevation above sea level
Building elevation above sea level is established through surveying and benchmarking processes that reference known elevation points. Batter boards are temporary layout tools that work with relative elevations and horizontal positioning, not absolute elevations above sea level.
Memory Technique
Think 'BATTER = BETTER strings' - the horizontal boards make it BETTER to string up accurate building lines that can be repeatedly referenced throughout construction.
Reference Hint
Look up 'Site Layout and Excavation' or 'Building Layout Procedures' in your construction reference manual, typically found in the site preparation or foundation chapters.
More Project Mgmt Questions
What is the minimum R-value required for wall insulation in Florida Climate Zone 2?
A subcontractor brings a new chemical product to your jobsite. Under the Globally Harmonized System (GHS), what information must be immediately available to workers?
A construction site has a trench that is 8 feet deep in Type B soil. What is the maximum allowable slope ratio for the trench walls without protective systems?
A detail drawing shows a scale of 3/4" = 1'-0". If a dimension measures 2.25 inches on the drawing, what is the actual dimension?
What is the maximum recommended spacing between drywall screws when attaching to wood studs?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Contract Administration
60 questions · 70% to pass
Previous Question
A crane is lifting a 8,000-pound load with a load block and rigging weighing 500 pounds. If the crane's load chart shows a capacity of 10,000 pounds at this radius, what is the safety margin?
Next Question
Under the Globally Harmonized System (GHS), Safety Data Sheets must contain how many standardized sections?