What is the maximum building height restriction for a Registered Building Contractor in Florida?
Correct Answer
B) Three stories
According to Chapter 489 F.S., Registered Building Contractors are limited to buildings of three stories or less in height.
Why This Is the Correct Answer
Chapter 489 F.S. specifically defines the scope of work for Registered Building Contractors, which includes a clear height limitation of three stories or less. This restriction is designed to differentiate between registered contractors and certified contractors, with certified contractors having broader authority for taller structures. The three-story limit is a fundamental licensing requirement that determines the types of projects a registered contractor can legally undertake in Florida.
Why the Other Options Are Wrong
Option A: Two stories
Two stories is too restrictive and underestimates the actual authority granted to Registered Building Contractors under Florida law.
Option C: Four stories
Four stories exceeds the legal authority of Registered Building Contractors and would require a Certified Building Contractor license.
Option D: No height restriction
There is definitely a height restriction for Registered Building Contractors - unlimited height would require certification, not just registration.
Memory Technique
Think 'R-3': Registered contractors are limited to 3 stories. The 'R' in Registered reminds you of the number 3 when turned backwards.
Reference Hint
Chapter 489 Florida Statutes - Construction Industry Licensing, specifically the definitions and scope of work sections for Registered Building Contractors
More Contract Admin Questions
A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?
A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?
What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?
A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?
A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?