A Certified Building Contractor license in Florida allows work on which types of structures?
Correct Answer
C) Buildings up to three stories in height
A Certified Building Contractor license permits work on buildings up to three stories in height, regardless of use type, but has height limitations unlike the General Contractor license.
Why This Is the Correct Answer
CORRECT_ANSWER - A Certified Building Contractor (CBC) license in Florida specifically allows work on buildings up to three stories in height, regardless of whether they are residential or commercial structures. This height limitation is the key distinguishing factor of the CBC license scope. The license does not restrict based on building use type, but rather on the structural height parameter.
Why the Other Options Are Wrong
Option A: Residential buildings only
This is incorrect because a CBC license is not limited to only residential buildings. The license allows work on both residential and commercial structures, as long as they meet the height requirement of three stories or less.
Option B: Commercial buildings only
This is incorrect because a CBC license is not limited to only commercial buildings. The license covers both residential and commercial projects, with the determining factor being height rather than building use type.
Option D: All building types with unlimited height and cost
This is incorrect because a CBC license has specific height limitations of three stories maximum. Unlimited height and cost would describe a General Contractor license, which has broader scope than the CBC license.
Memory Technique
Use 'CBC = 3' - Certified Building Contractor equals 3 stories maximum. Think 'Can Build Carefully' up to 3 floors only.
Reference Hint
Florida Statutes Chapter 489 - Construction Industry Licensing, specifically sections dealing with contractor license classifications and scope of work
More Contract Admin Questions
A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?
A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?
What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?
A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?
A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Project Management
60 questions · 70% to pass
Previous Question
Which document is required before a new commercial building can be legally occupied by tenants?
Next Question
During construction, a utility line is discovered 3 feet from its location shown on the drawings. The contractor relocates the line and continues work. What documentation is required?