What does LEED stand for in sustainable construction?
Correct Answer
B) Leadership in Energy and Environmental Design
LEED stands for Leadership in Energy and Environmental Design, which is a green building certification program that recognizes best-in-class building strategies and practices.
Why This Is the Correct Answer
LEED stands for Leadership in Energy and Environmental Design, which is the most widely used green building rating system in the world. It was developed by the U.S. Green Building Council (USGBC) to provide a framework for healthy, highly efficient, and cost-saving green buildings. LEED certification is a globally recognized symbol of sustainability achievement and leadership that demonstrates a building project is environmentally responsible and uses resources efficiently.
Why the Other Options Are Wrong
Option A: Low Energy Efficient Design
While 'Low Energy Efficient Design' contains relevant sustainability concepts, this is not the correct acronym for LEED. The actual LEED program emphasizes leadership and comprehensive environmental design, not just low energy efficiency.
Option C: Limited Environmental and Economic Development
This option incorrectly suggests LEED stands for 'Limited Environmental and Economic Development,' which contradicts the program's purpose of promoting comprehensive and expansive sustainable building practices rather than limiting development.
Option D: Local Energy and Environmental Documentation
While 'Local Energy and Environmental Documentation' touches on environmental themes, LEED is not primarily about documentation or local focus, but rather about leadership and comprehensive design standards that can be applied globally.
Memory Technique
Think 'LEAD the way in Environmental Design' - LEED programs LEAD the construction industry toward better environmental practices through Leadership in Energy and Environmental Design.
Reference Hint
Look up sustainable construction practices or green building standards in your construction management or building codes reference materials, typically found in chapters covering environmental regulations or sustainable building practices.
More Contract Admin Questions
A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?
A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?
What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?
A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?
A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Project Management
60 questions · 70% to pass