Under Florida Statute Chapter 489, which license classification allows a contractor to perform work on residential buildings up to three stories in height?
Correct Answer
C) Certified Residential Contractor
A Certified Residential Contractor license allows work on residential buildings up to three stories in height. This is specifically defined in Chapter 489, Florida Statutes.
Why This Is the Correct Answer
CORRECT_ANSWER - Under Florida Statute Chapter 489, a Certified Residential Contractor license specifically authorizes work on residential buildings up to three stories in height. This classification is designed for contractors who specialize in residential construction projects. The three-story height limitation is a key defining characteristic that distinguishes this license from other contractor classifications. This scope includes single-family homes, duplexes, townhomes, and small residential buildings within the height restriction.
Why the Other Options Are Wrong
Option A: Certified General Contractor
While a Certified General Contractor has broader scope and can perform residential work, this is not the most specific answer. The question asks for the license classification that specifically allows work on residential buildings up to three stories, and the Certified Residential Contractor is the precise classification for this scope.
Option B: Certified Building Contractor
A Certified Building Contractor typically focuses on commercial and institutional buildings rather than residential structures. This classification is not specifically designed for residential buildings up to three stories in height.
Option D: Certified Commercial Contractor
There is no 'Certified Commercial Contractor' classification under Florida Statute Chapter 489. This is not a valid license type in Florida's contractor licensing system.
Memory Technique
Think 'RES-3' - RESidential contractor for up to 3 stories. The name directly indicates the scope, and three stories is the maximum height limit.
Reference Hint
Florida Statute Chapter 489 - Contractor licensing definitions and scope of work sections
More Contract Admin Questions
A project experiences a 30-day delay due to unusually severe weather. The contract includes a liquidated damages clause of $1,000 per day for delays. If the weather delay is excusable but not compensable, what liquidated damages apply?
A commercial project requires a total of 12 inspections. The building department charges $85 per inspection for the first 5 inspections, $65 for inspections 6-10, and $45 for any additional inspections. What is the total inspection fee?
What document must be posted at the job site before a Certificate of Occupancy can be issued for a commercial building?
A mixed-use development requires a variance for reduced setbacks. The property is located within 500 feet of a hospital. What additional consideration must be addressed?
A LEED project requires tracking of regional materials. Materials are considered regional if they are extracted, harvested, or recovered, as well as manufactured within what distance of the project site?
People Also Study
Business & Financial Management
120 questions · 70% to pass
Project Management
60 questions · 70% to pass
Previous Question
During a weekly construction coordination meeting, the electrical subcontractor reports they cannot install panel boxes until the framing is complete. This is an example of what type of dependency?
Next Question
A subcontractor is working on a project where the general contractor has not paid them for work completed 45 days ago. The subcontractor wants to protect their lien rights. What document should they serve first under Florida lien law?