A mobile crane with a 75-foot boom is being used to lift materials. The load is 8,000 pounds and will be placed 60 feet from the crane's center of rotation. What is the primary safety concern?
Correct Answer
C) Load chart capacity limits
The primary concern is ensuring the lift does not exceed the crane's rated capacity as shown in the load chart. Capacity decreases significantly with radius, and exceeding limits can cause crane tip-over.
Why This Is the Correct Answer
Load chart capacity limits are the primary safety concern because crane capacity decreases dramatically as the load radius increases. At 60 feet from the center of rotation with an 8,000-pound load, the operator must verify this combination doesn't exceed the crane's rated capacity shown in the manufacturer's load chart. Exceeding these limits is the most common cause of crane tip-overs and catastrophic failures. The load chart is the definitive safety reference that accounts for boom length, load weight, and working radius.
Why the Other Options Are Wrong
Option B: Wind speed restrictions
Wind speed restrictions are important but typically become critical at higher wind speeds (usually above 20-25 mph). Without information about current wind conditions, and given the specific load and radius mentioned, capacity limits are the more immediate concern for this scenario.
Option D: Ground bearing pressure
While ground bearing pressure is important for crane stability, it's typically addressed during initial setup and site preparation. The immediate operational concern during this specific lift is whether the crane can safely handle the load at the given radius, not the ground conditions.
Memory Technique
Remember 'LRC' - Load + Radius = Check the Chart. The further out you go, the less you can lift.
Reference Hint
OSHA 1926 Subpart CC - Cranes and Derricks in Construction, specifically sections on load charts and capacity requirements
More Project Mgmt Questions
What is the minimum R-value required for wall insulation in Florida Climate Zone 2?
A subcontractor brings a new chemical product to your jobsite. Under the Globally Harmonized System (GHS), what information must be immediately available to workers?
A construction site has a trench that is 8 feet deep in Type B soil. What is the maximum allowable slope ratio for the trench walls without protective systems?
What is the maximum recommended spacing between drywall screws when attaching to wood studs?
Your crew discovers suspected asbestos-containing materials during a renovation project. What is the first action you should take?
A scaffold platform is 12 feet long and 5 feet wide. If the maximum load capacity is 25 pounds per square foot, what is the total weight capacity of this platform?
Which CSI MasterFormat Division would contain specifications for fire-stopping and firesafing materials?
In tilt-up concrete construction, what is the primary advantage of this method over conventional cast-in-place construction?
Which OSHA standard specifically addresses construction industry safety and health regulations?
A structural drawing shows a beam labeled 'W12x26'. What does the '26' represent?
People Also Study
Business & Financial Management
120 questions Β· 70% to pass
Contract Administration
60 questions Β· 70% to pass