What is required before starting construction of a new two-storey family home in New Zealand?
Correct Answer
D) Building consent, plus resource consent if plan rules are breached
A new two-storey house needs building consent under the Building Act 2004. Resource consent is needed as well only if the design breaches a district plan rule. (Since 15 January 2026, a single-storey stand-alone dwelling of up to 70 m² can be built without building consent under Schedule 1A, which is why this question specifies a two-storey family home.)
Why This Is the Correct Answer
Building consent is needed for a two-storey house. Resource consent is also needed only if the design breaches a district plan rule, such as height, setbacks or site coverage.
Why the Other Options Are Wrong
Option A: Resource consent only
Resource consent does not authorise construction. A two-storey house needs building consent under the Building Act 2004.
Option B: Building consent only
Building consent is needed, but this ignores that a breach of a district plan rule would also need resource consent.
Option C: Both resource consent and building consent
Resource consent is not always needed. A house that meets every plan standard is a permitted activity.
Deep Analysis of This Resource Management Question
Two regimes apply. The Building Act 2004 governs how the house is built; a two-storey family home is outside the Schedule 1 and Schedule 1A exemptions, so it needs building consent. The RMA governs whether the house may be built as designed; if it meets every district plan standard it is permitted, and if it breaches one it needs resource consent. The complete answer covers both.
Background Knowledge for Resource Management
Building consent comes from the building consent authority under the Building Act 2004. Exemptions are in Schedule 1 (minor work) and Schedule 1A (from 15 January 2026, single-storey stand-alone dwellings up to 70 m², subject to conditions). Resource consent comes from the council under the RMA only where the proposal is not a permitted activity under the district plan.
Memory Technique
Building consent answers 'is it built safely?'; resource consent answers 'is it allowed here?'. A normal family home needs the first. It needs the second only if it breaks a plan rule.
For a new-house question, first check the building consent exemptions (small single-storey dwellings), then check whether any district plan rule is breached.
Exam Tip for Resource Management
Prefer the answer that says building consent plus resource consent only if the plan is breached. Watch for the small stand-alone dwelling exemption if the question describes a single-storey unit of 70 m² or less.
Real World Application in Resource Management
A client wants to build a new home on their residential section. As their agent, you'd advise them to first check the district plan rules for their zone - setbacks, height limits, site coverage. If their proposed house meets all these standards, they only need building consent. However, if they want a house that's taller than allowed, has insufficient setbacks, or exceeds site coverage limits, they'll need both building consent and resource consent. You'd recommend they consult a planner early to determine consent requirements before engaging architects, potentially saving thousands in redesign costs.
Common Mistakes to Avoid on Resource Management Questions
- •Assuming resource consent is always required for new dwellings
- •Thinking building consent covers planning/environmental matters
- •Confusing permitted activities with consented activities
Related Topics & Key Terms
Key Terms:
More Resource Management Questions
A developer wants to subdivide Rural-zoned land into residential sections. The district plan does not prohibit this, but says consent can be granted only if the proposal passes the section 104D gateway test. What activity status does that indicate?
A homeowner receives a LIM report showing that previous resource consent was granted with ongoing conditions requiring annual monitoring reports. What does this mean for the new owner?
A property owner receives a notice that their building work was undertaken without a building consent. What is this notice likely to be called?
Under the Building Act 2004, which type of building work typically requires a building consent?
A client wants to subdivide their rural property into smaller lots. What type of consent will they most likely need under the RMA?
- → Under section 104 of the RMA, when considering a resource consent application, what must a consent authority have regard to alongside the actual and potential effects on the environment?
- → Under the Resource Management Act 1991, what is the primary purpose of district plans?
- → A property developer wants to subdivide a 2-hectare residential section into 10 lots. Under typical district plan rules, what consents would likely be required?
- → Under the Building Act 2004, which authority is responsible for issuing building consents?
- → Which of the following activities would most likely require resource consent under the RMA?
- → What is the main difference between a regional plan and a district plan?
- → A property has an existing resource consent for a home-based business that expires in two years. What happens if the owners want to continue the business after the consent expires?
- → A developer has obtained resource consent for a subdivision but discovers during earthworks that the site contains archaeological features. What is the most likely immediate consequence under New Zealand law?
- → A LIM report will typically include information about which of the following?
- → Sarah wants to build a two-storey house on her vacant section in a residential zone, and the design meets all of the district plan's standards. What consent process will she need to follow?
People Also Study
Property Law & Legislation
56 questions
Agency Practice
89 questions
Sale & Purchase Process
63 questions
Professional Conduct & Ethics
46 questions